Tubería de acero al carbono A36

Tubería de acero al carbono A36
Tubería de acero al carbono A36
Tubería de acero al carbono A36
Tubería de acero al carbono A36
  • Tipo de Pago: L/C,T/T,D/P,D/A,Paypal,Others
  • Incoterm: FOB,CFR,CIF,EXW,FAS,FCA,CPT
  • Cantidad de pedido mínima: 1 Ton
  • transporte: Ocean,Land,Air,Express
Share:
Tel: 86--15224342533 MOB:+8615224342533 Contáctenos >
Detalle del producto Descripción
Atributos del producto

ModeloSeamless Steel Pipe

Marcajianlong

StandardAisi, Astm, Bs, Din, Gb, Jis

Place Of OriginChina

Production ProcessHot Rolled

ApplicationBoiler Plate, Container Plate, Flange Plate, Ship Plate

Tolerance±1%

Processing ServiceBending, Welding, Decoiling, Cutting, Punching

Section ShapeRound

Outer Diameter8 - 1020 mm

StandardASTM, GB/T5310

CertificateAPI, ISO9001, OSHMS, IOS14001

Surface TreatmentHot Rolled

Invoicingby actual weight

Thickness0.25-200mm

Length12M, 6m, Customization, Random Length

Oiled Or Non-oiledNon-oiled

MOQ1000KG

Embalaje y entrega
Unidades de venta: Ton
Tipo de paquete: Embalaje de exportación estándar o de acuerdo con los requisitos del cliente
Ejemplo de una imagen:
Capacidad de suministro e información adicional

PaqueteEmbalaje de exportación estándar o de acuerdo con los requisitos del cliente

productividad10000 tons per month

transporteOcean,Land,Air,Express

Lugar de origenChina Shandong

Apoyo sobre3000 tons per month

Certificados ISO

HS-Code730419

Tipo de PagoL/C,T/T,D/P,D/A,Paypal,Others

IncotermFOB,CFR,CIF,EXW,FAS,FCA,CPT

Descripción


Descripción del Producto

El tubo de acero de la caldera se divide en un tubo de caldera general y un tubo de caldera de alta presión de acuerdo con el alto rendimiento de la temperatura. Si el tubo de caldera general o el tubo de caldera de alta presión de acuerdo con sus requisitos de uso se pueden dividir en una variedad de tubos de acero.

La tubería general de la caldera se usa principalmente para fabricar tubos de pared de agua, tubería de agua hirviendo, tubería de vapor sobrecalentado, caldera de locomotora con tubo de vapor sobrecalentado, tubería de humo grande y pequeña y tubería de ladrillo de arco. El tubo de caldera de alta presión se usa principalmente para fabricar tubo de sobrecalentador de caldera de alta presión y súper alta presión, tubo de recalentamiento, tubería de guía, tubería de vapor principal, etc.


Especificaciones del producto

Name

Seamless Steel Tube 

Length

MAX 18000

OD

6.0-114.0mm

 Delivery Condition

Annealed, Normalized, Normalized and Tempered

Surface treatment

Oil-dip, Varnish, Passivation, Phosphating, Shot Blasting

Application

 

For high, middle, low pressure boiler and pressure purpose. 

Used in heat exchangers and boilers to provide highly energy efficient means of heat transfer. The presence of the internal rifling induces centrifugal forces in the mass flow thereby separating the water from the steam fraction and forcing the water towards the tube wall.

 

 

Standard & Grade

ASTM, ASME, A/SA 192, 209, 210 and 213 specifications and all associated grades. EN 10216, DN 17175, BS 3059, JIS 3461 – 3462

Approvals

ISMT is ISO 14001, ISO/TS 16949:2002, and OHSAS 18001 approved. In addition we hold approvals from all major national and
international official authorities, customers, and third party certification agencies.

Grade and Mechanical Properties:

C(Max)

Mn

Si(Min)

P(Max)

S(Max)

0.35

0.29-1.06

0.10

0.035

0.035

Grade and Chemical composition:

Grad

Tensile Strength(Mpa)

Yield Strength(Mpa)

Elongation (%)

 

C

≥ 485

≥ 275

≥ 30




Ofrecemos diferentes modos de transporte dependiendo del destino del cliente: transporte ferroviario y transporte de barcos, etc. La marca de envío consistirá en: Marca, nombre del vendedor, nombre del producto, estándares aplicables, especificaciones, paquete No., No. de contrato, calor No., fecha de producción, método de pesaje, peso neto, peso bruto, símbolos consignatorios y protección, etc.

Pantalla del producto


seamless steel pipe (117)seamless steel pipe (134)


Embalaje y transporte


steel (1) steel (4)steel0.7

steel (3)steel sm


Preguntas más frecuentes

1. ¿Por qué nos eliges?

Nuestra empresa ha pasado 12 años. Controlamos la calidad de los productos muy estrictamente, hay personas especiales para la calidad.

Si obtuvo un precio más bajo de otro proveedor, pagaremos dos veces a los clientes sobre el precio más alto.

2. ¿Cuánto tiempo es su tiempo de entrega?

De acuerdo con la cantidad. Generalmente dentro de 2-7 días si está en stock. Y 15-20 días si no está en stock.

3. ¿Cuáles son sus términos de pago?

R: T/T 30% de anticipación, y 70% antes del parto.

B: 100% L/C a la vista.

C: por T/T 30% de anticipación, y 70% L/C a la vista.

4. ¿Proporciona muestras? ¿Es gratis?

Sí, ofrecemos la muestra de forma gratuita, pero no pagamos el costo de la carga.

5. ¿Qué pasa si el cliente no está satisfecho?

Si hay un problema con el producto, asumimos toda la responsabilidad.

Si hay un problema en el proceso de transporte, lo ayudaremos a resolverlo.



vídeo
tubo sin costura (1)
Leave A Message
If you have questions or suggestions,please leave us a message,we will reply you as soon as we can!
-
Please fill in the information
*
Please fill in your e-mail
*
Please fill in the content
Realizar consulta
*
*

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Enviar